GRASP with path-relinking for the non-identical parallel machine scheduling problem with minimising total weighted completion times

  1. Rodriguez, F.J.
  2. Blum, C.
  3. García-Martínez, C.
  4. Lozano, M.
Zeitschrift:
Annals of Operations Research

ISSN: 0254-5330 1572-9338

Datum der Publikation: 2012

Ausgabe: 201

Nummer: 1

Seiten: 383-401

Art: Artikel

DOI: 10.1007/S10479-012-1164-8 GOOGLE SCHOLAR