GRASP with path-relinking for the non-identical parallel machine scheduling problem with minimising total weighted completion times

  1. Rodriguez, F.J.
  2. Blum, C.
  3. García-Martínez, C.
  4. Lozano, M.
Revista:
Annals of Operations Research

ISSN: 0254-5330 1572-9338

Ano de publicación: 2012

Volume: 201

Número: 1

Páxinas: 383-401

Tipo: Artigo

DOI: 10.1007/S10479-012-1164-8 GOOGLE SCHOLAR